
Vertical Post for hatch Handling - Centrica IRM (10/2015)
Navatech Ltd was contracted by Bibby Offshore to perform the design of:
– Two bumper frames on the back deck of the Olympic Bibby. The Bumper frame will guide the recovery of the Proserv Soil Plug tool.
– Two rigging posts 2.2m tall required either side of the Olympic Bibby moonpool in order to open the moonpool door hatches.
(Photos courtesy Bibby Offshore)
Bumper Frame:


Vertical Rigging post:
