6Te Winches & Chutes Grillage Design, Centrica IRM (05/2015)
Navatech Ltd was contracted by Bibby Offshore to perform the design/seafastening of two grillages supporting 6te SWL winches and chutes aboard the Olympic Bibby. The chutes/winches are used to deploy a pre commissioning hose for the Centrica IRM.
It was proposed to seafasten the winches and the chutes onto the same UC grillages.
Work included:
– 2 grillages design and seafastening (supporting a single and a double chute)
– Seafastening of UES P030 - 010 chutes
– Seafastening of K6UL Ingersoll-Rand air winches
(Photos courtesy Bibby Offshore)