
MacCulloch Decommissioning Project - Conoco Phillips (06/2015)
Navatech Ltd has been contracted by Bibby Offshore to structurally design the recovery of various flexibles as part of the phase 1 of the MacCulloch decommissioning project. Various deck equipment have to be installed onboard the Olympic Ares to facilitate this.
– Shear Cutter
– 60te Winch
– Shear Table
– Corals to receive cut flexibles
– Deck sheave
– Deck Quadrant
(Photos courtesy Bibby Offshore)