
Reel Drive System - Conoco Phillips, Brodgar Flexible Installation (10/2014)
In charge of the structural design of 3x90Te reels onboard the Olympic Ares. MDL Reel Drive System was used.
Work included:
• CTR (cost time and resource) definition
• RDS spread Seafastening design and deck verification
• Liaising with project team/drafting office to get information and proposed design
• Liaising with DNV to get approval